41 Jan 19 |
Make the most of your Software Experience (you''ll need superior coding skills for hardware next year) |
DER Exemplar |
||
![]() |
||||
| CLASS | REFERENCE | SUPPORT | CONCEPTS | SUPPLEMENTAL |
![]() |
A Counting Circuit Soldering Work Period |
|||
| A Counting Circuit Soldering Work Period Stage G Soldering Tips |
||||
| CHRISTMAS BREAK (December 18 - January 6) | ||||
| CLASS | REFERENCE | SUPPORT | CONCEPTS | SUPPLEMENTAL |
|
37 Dec 16 |
Variations on D. Decimal Counting NGO Frequency, 4510 A Counting Circuit E. Binary Coded Decimal (BCD) Decoder The 4511 BCD to 7-Segment Decoder Falstad: The 4511 'a' Segment |
|||
| CLASS | REFERENCE | SUPPORT | CONCEPTS | SUPPLEMENTAL |
|
36 Dec 12 |
A Counting Circuit Review of C. Decade Counter (4017) D. Decimal Counting Binary Up/Down Counter (4510) The 4516 Up/Down (0-15) Counter |
|||
|
|
A Counting Circuit Concepts and Exploring Modifications: 1. Reading Diagrams: Pin and Block 2. NGO Clock Input: Duration and Frequency 3. Reset: Button, Limited Counting 4: Pin 12: Divide by 10 (aka. Carry Out) 5. Concepts: Timing Diagrams and Duty Cycle Come and watch (be prepared to gasp!) Alumni Visit on December 12 @ lunch in the DES K. Fiset-Algarvio (ACES '19, Guelph Eng. '25) Live Demonstrations of two of his ACES Projects: |
|||
| A Counting Circuit C. Decade Counter (4017) NGO Square Wave Output as Clock Input to our FIRST Specialized IC: The 4017 Decade Counter |
||||
34 Dec 8 |
![]() |
A Counting Circuit Fill/Drain Animations: RC2-0.01uF, RC2-0.1uF Explore changes to RC1 and RC2 components |
||
| CLASS | REFERENCE | SUPPORT | CONCEPTS | SUPPLEMENTAL |
A Counting Circuit Analog and Digital Interfacing Example: The Potentiometer into a NAND Gate? A. Button Input Animations: tp1, tp2, 3 B. NAND Gate Oscillator (4011) Part 1 Animation: TP3, RC Drain |
||||
Your ultimate Counting Circuit goal, 8 classes from now, as S. Appleyard achieved in early 2021...![]() |
||||
| CLASS | REFERENCE | SUPPORT | CONCEPTS | SUPPLEMENTAL |
24 Nov 23 |
RSGC ACES Christmas Tree Project.1 1. RC Oscillator 2. The 4060 Frequency Divider The 'Illusion' of Counting... ![]() Falstad Simulation |
|||
Prep For RSGC ACES Xmas Tree Week |
||||
| CLASS | REFERENCE | SUPPORT | CONCEPTS | SUPPLEMENTAL |
Be Smart! Develop your DER if you've finished encasement |
||||
| MID-TERM BREAK (NOVEMBER 13-16) Classes Resume on Tuesday November 17 (Cycle 1 - Day 7) | ||||
| PARENT-TEACHER INTERVIEWS (November 13 and 14) | ||||
| CLASS | REFERENCE | SUPPORT | CONCEPTS | SUPPLEMENTAL |
|
ACES Binary Challenge (ABC) Qualifying Round #3 Multiple Logic Gates... ACES' Frame Player: Combinational Circuits |
||||
| CLASS | REFERENCE | SUPPORT | CONCEPTS | SUPPLEMENTAL |
|
Transitioning... ACES' Frame Player: Analog to Digital Recall VENN Diagrams BOOLE(AN) LOGIC OPERATORS ACES' Frame Player: Button Logic ACES' Frame Player: Transistor Logic (p. 44) |
||||
| CLASS | REFERENCE | SUPPORT | CONCEPTS | SUPPLEMENTAL |
![]() |
||||
ACES' Analog Oscillator![]() |
Dual Role of Transistors:
Switching and Amplification Falstad Circuit Simulation Applet: Switched LED, Transistor Tester Alternating LEDs, Fade Out |
|||
| CLASS | REFERENCE | SUPPORT | CONCEPTS | SUPPLEMENTAL |
|
The device that changed everything... p. 35 Transistor Basics, Testing, and Switches The NPN Transistor (2N3904): Animation The PNP Transistor (2N3906): Animation TO-92 (BJT) Datasheets: 2N3904 NPN, 2N3906 PNP ACES' Frame Player: Transistors |
||||
| 1.1 |
||||
| 1.1 October 24, 2026 Marked the Final Pythagorean Triple Date of the Century |
||||
| CLASS | REFERENCE | SUPPORT | CONCEPTS | SUPPLEMENTAL |
|
14 Oct 22 |
Header&Footer, Date&Time, Tables, Page Break , Section Break Table of Contents |
|||
| 1.1 DER Exemplar |
||||
|
|
The Capacitor Visualizer The Capacitor Visualizer Soldering Video Tutorial Case Preparation and Assembly Custom 3D-printed case, heat-set inserts, Panel mount DC barrel jack, hookup wires, heat shrink tubing, 3mm nylon mounting screws |
![]() |
||
| CLASS | REFERENCE | SUPPORT | CONCEPTS | SUPPLEMENTAL |
![]() |
||||
DMM: Capacitance Review Capacitor Circuits on page 32 Prototype the circuit to the left... ...and then the rollover modification The Math behind Capacitors Capacitors as Timers: `tau = R times C` |
1.1
![]() |
|||
Introducing TIMING (Delays) into our Circuits Capacitor Codes Falstad: Capacitor Visualization ACES' Frame Player: Capacitors |
Rocket Launch Challenge Results nc AC** ED pd OG* eh mh FH ZJ* ML NM JS** NW** ![]() |
|||
| Oct 11 | THANKSGIVING WEEKEND (Oct 9-12) | |||
| CLASS | REFERENCE | SUPPORT | CONCEPTS | SUPPLEMENTAL |
10 Oct 7 |
|
Pull DOWN Resistor Configurations Pull UP Resistor Configurations |
Rocket Launch p. 25 ![]() Complete the Rocket Launch Challenge! JB NC AC ED PD OG EH MH FH ZJ ML NM JP JS NW |
|
The DUAL Uses for the Potentiometer: Variable Resistor and Voltage Divider First Look at the... Voltage H-Bridge |
Analog-ish Voltage H-Bridge ![]() |
|||
| CURRICULUM EVENING (October 5 - Day 7) | ||||
9 Oct 5 |
ACES' Frame Player: Variable Resistors 2. LDR: Light-Dependent Resistor aka Photocell, Photoresistor, Optoresistor 3. Thermistor:Temp-Dependent Resistor 4. FSR: Force-Sensitive Resistor 5. Flex Sensor: Flex-Sensitive Resistor J. Vretenar's: |
Voltage: `V=IR` Power: `P=IV` |
||
| CLASS | REFERENCE | SUPPORT | CONCEPTS | SUPPLEMENTAL |
8 Oct 1 |
Interactive Circuits :) Fixed vs Variable Resistors 1. The Potentiometer (p. 11) ACES' Frame Player: Potentiometer |
![]() |
||
ACES' Frame Player:
LED Circuits
RSGC ACES' LED Tester Soldering, Assembly & Testing Session Using Ohm's Law to determine the Current (I) in a circuit : `I=V/R` |
Using Ohm's Law and Kirchhoff's Laws to Analyze Circuits ![]() |
|||
| TERRY FOX DAY (September 25) | ||||
| CLASS | REFERENCE | SUPPORT | CONCEPTS | SUPPLEMENTAL |
6 Sep 24 |
PBNO ![]() PBNC ![]() |
Buttons (PBNO, PBNC) ACES' Frame Player: Buttons Digital Button Logic: Pull-Down and Pull-Up Resistor Configurations |
![]() |
|
5 Sep 22 |
(aka Schematics) Circuit Symbols (p. 7) DMM Confirmation of KVL (Waterfall Model of Voltage Drop) |
Current Calculation
Falstad LED Circuit Comparison
|
||
![]() |
||||
| CLASS | REFERENCE | SUPPORT | CONCEPTS | SUPPLEMENTAL |
Your First Soldering Task (Your Solder Tube)
|
Your joints should like these... TOP BOTTOM |
|||
(aka Schematics) Circuit Symbols p. 8 Falstad Circuit Simulator Applet |
Ohm's Law (in terms of Current, I) `I=V/R` Power: `P=IV` |
|||
|
Second DMM Function: 2. Resistance (Ω) Fixed (Current-Limiting) Resistor Applet Familiarize yourself... |
|
|||
Where the MAGIC happens![]() ![]() |
||||
Giants of Electricity p.93
Discussion: What is Electricity? The Atom Water Analogies Flow Models (Direction): Electron (Neg →Pos) (Science) vs Conventional (Pos→Neg) (Electronics) |
DC Circuits' Cover Video... G. Davidge's: Foundations: Grade 9 Science... Ohm's Law (in terms of Voltage): `V=IxxR` Ohm's Law (in terms of Current): `I=V/R` Your Future: EVs and Batteries |
![]() Alkaline Battery Chemistry |
||
| CLASS | REFERENCE | SUPPORT | CONCEPTS | SUPPLEMENTAL |
|
1 Sep 10 |
REPUTATION and RESPECT RSGC ACES Mission: Taking a Short, Medium, and Long Term View of your Futures ACES Hall of Fame: J. Dolgin '20 (Tesla) D. Raymond '19 (SpaceX) E. Peterson '18 (Apple/Jane Street Capital) E. McAuliffe '18 P. Bagga '17 (Ford), T. Hillyer '15 (TikTok) Mariano Elia '15: Hackster.io, Argon Prototypes |
ACES Focus: Foundations ![]() |
||
![]() |
||||