ab ab   e 
ICD2O-E: FALL 2025
END (OF COURSE)
DIGITAL 2: A COUNTING CIRCUIT
CLASS REFERENCE SUPPORT CONCEPTS SUPPLEMENTAL
41
Jan 19
Make the most of your
Software Experience
(you''ll need
superior coding skills
for hardware next year
)
DER Exemplar
DER Final Submission:
Project 1.3 A Counting Circuit
1.3
A Counting Circuit
JD HG CH* RH** JL
TMS WM LN WR AW
NC QD ED TJ** DL
TL MM EM MO AT*
40
Jan 13
Counting Circuit Encased
1.3 (H)
CLASS REFERENCE SUPPORT CONCEPTS SUPPLEMENTAL
39
Jan 9
A Counting Circuit
Soldering Work Period
1.3 (G)

1.3 (H)
38
Jan 7
A Counting Circuit
Soldering Work Period



Stage G Soldering Tips
1.3 (F)

1.3 (G)

1.3 (H)
CHRISTMAS BREAK (December 18 - January 6)
CLASS REFERENCE SUPPORT CONCEPTS SUPPLEMENTAL
37
Dec 16

Variations on D. Decimal Counting
NGO Frequency, 4510
A Counting Circuit
E. Binary Coded Decimal (BCD) Decoder

The 4511 BCD to 7-Segment Decoder
Falstad: The 4511 'a' Segment
Click for

Interfacing Strategy

1.3 (E)
CLASS REFERENCE SUPPORT CONCEPTS SUPPLEMENTAL
36
Dec 12

A Counting Circuit
Review of
C. Decade Counter (4017)
Decade Counter with Carryout

D. Decimal Counting
Binary Up/Down Counter (4510)

The 4516 Up/Down (0-15) Counter

1.3 (D)

Project Idea:
3x3x3 LED Cube


A Counting Circuit
Concepts and Exploring Modifications:
1. Reading Diagrams:
Pin and Block
2. NGO Clock Input: Duration and Frequency
3. Reset
: Button, Limited Counting
4: Pin 12
: Divide by 10 (aka. Carry Out)
Decade Counter with Carryout
5. Concepts: Timing Diagrams and Duty Cycle
Come and watch (be prepared to gasp!)
Alumni Visit on December 12 @ lunch in the DES
K. Fiset-Algarvio
(ACES '19, Guelph Eng. '25)
Live Demonstrations of two of his ACES Projects:
8x8x8 LED Cube andPOV Globe
4017 Timing Diagram:

35
Dec 10

Falstad (Thanks to EM)
4017 Simulation

A Counting Circuit
C. Decade Counter (4017)
NGO Square Wave Output as Clock Input
to our
FIRST Specialized IC:
The 4017 Decade Counter
RSGC ACES: Decade Counter


1.3 (C)
34
Dec 8
A Counting Circuit
Fill/Drain Animations:
RC2-0.01uF, RC2-0.1uF

Explore changes to
RC1 and RC2 components
ACES' Christmas Tree
LN EM TJ* TMS
1.3 (B)
CLASS REFERENCE SUPPORT CONCEPTS SUPPLEMENTAL
33
Dec 4

A Counting Circuit
Analog and Digital Interfacing Example:
The Potentiometer into a NAND Gate?
A. Button Input
Animations: tp1, tp2, 3

B. NAND Gate Oscillator (4011) Part 1
Animation: TP3, RC Drain


1.3 (A)
1.3 (B)
32
Dec 2
RSGC ACES
Christmas Trees

The Quartz Crystal
Tuning Fork


Enrichment for Section 1
The Pierce Oscillator
Work Period for Section 2
RSGC ACES' Christmas Tree

Fall '25
Thomas & Arlo
Your ultimate Counting Circuit goal, 8 classes from now, as S. Appleyard achieved in early 2021...
DIGITAL 1: INTEGRATED CIRCUITS: LOGIC GATES and Specialty ICs
CLASS REFERENCE SUPPORT CONCEPTS SUPPLEMENTAL
31
Nov 28
RSGC ACES
Christmas Trees
4060: Multiple LED Strings

(Falstad Simulation)
The 2-Bit Adder
JD HG CH** RH* JL
TMS* WM LN WR* AW
NC QD ED TJ* DL
TL MM EM MO AT*
30
Nov 26
Binary Game: Finals

4060 14-bit (÷16,384)
ripple counter
with internal oscillator

Return of Adder Sticks
The 'Illusion' of Counting...
The 4060 Frequency Divider

(Falstad Simulation)
Recall...
Project 1.2 The 2-Bit Adder due TOMORROW (Tuesday) NIGHT
29
Nov 24
RSGC ACES' Christmas Tree
Build this RC Oscillator

using this EXACT layout...

(Falstad Simulation)
CLASS REFERENCE SUPPORT CONCEPTS SUPPLEMENTAL
28
Nov 20
Binary Game
Semi-Finals

Click for 3D View
Work Period
(Drama to Stratford)
Supplementary Parts Table
1.2

27
Nov 18
Binary Game
Quarter-Finals


2-Bit Adder PCB

2-Bit Adder Device:
PCB and Case Preparations
(in-class Instructions)
2-Bit Adder Case

Click for 3D View...
1.2
8-Bit Addition
PARENT-TEACHER INTERVIEWS (November 13 and 14)
CLASS REFERENCE SUPPORT CONCEPTS SUPPLEMENTAL
26
Nov 13
A second site
to bookmark...
CMOS 4000 ICs
Falstad Simulation
Half-Adder

Falstad Simulation
Full-Adder
Asynchronous Day (Have your kit at home!)
Falstad Simulation
2-Bit Adder

1.2

RSGC ACES
Adder Stick
25
Nov 11
Binary Game
Qualifying #4

Half Adder


2-Bit Adder

Full Adder
MID-TERM BREAK (NOVEMBER 7-10) Classes Resume on Tuesday November 11 (Cycle 1 - Day 5)
CLASS REFERENCE SUPPORT CONCEPTS SUPPLEMENTAL
22
Nov 5
Bookmark this site:
CMOS IC Descriptions:
Electronics Club
RGB (CC) LED
1-Bit Magnitude Comparator

Falstad Interactive
1-Bit
Magnitude
Comparator

21
Nov 3


Confirm with your
Mac Calculator App (Programmer)

Sinking and Sourcing
ACES Binary Challenge (ABC)
Qualifying Round #1
Multiple
Logic Gates...
ACES' Frame Player:
Combinational Circuits

CLASS REFERENCE SUPPORT CONCEPTS SUPPLEMENTAL
20
Oct 30

p. 50



CMOS LOGIC ICs in your
e
Saw this on a website today!




ACES'
Binary
Tools

NumbersByBase.xlsx
Cisco Systems

Practice!
19
Oct 28

George Boole
Must watch...
Boole

John Venn
Transitioning...
ACES' Frame Player:
Analog to Digital

COMPUTER MATH/LOGIC
Recall VENN Diagrams
BOOLE(AN) LOGIC OPERATORS
ACES' Frame Player: Button Logic

ACES' Frame Player: Transistor Logic
(p. 44)

ACES
Engineering Your
Foundation

ANALOG 2: BUTTONS, SWITCHES, CAPACITORS, and TRANSISTORS
CLASS REFERENCE SUPPORT CONCEPTS SUPPLEMENTAL
Click for Interactive 3D View

18
Oct 24
ACES' Analog Oscillator
Dual Role of Transistors:
Switching and Amplification
Analog vs Digital
Falstad Circuit Simulation Applet:
Switched LED, Transistor Tester
Alternating LEDs, Fade Out
Capacitor
Visualizer

JD* HG CH* RH JL*
TMS* WM LN WR* AW
NC QD ED TJ* DL
TL MM EM MO AT*
17
Oct 22


  
The device that changed everything...
Introducing the Transistor
DC Circuits Workbook
p. 35

Transistor
Basics, Testing, and Switches
The NPN Transistor (2N3904): Animation
The PNP Transistor (2N3906): Animation
TO-92 (BJT) Datasheets:
2N3904 NPN, 2N3906 PNP
ACES' Frame Player: Transistors

Transitioning from..
Analog to Digital
from continuous to discrete

Analog vs Digital
16
Oct 20


Watch these videos
Technical Writing:
Don'ts and Dos

Use of the
Active Voice
The INSERT Tab Pt. 2:
Picture, Symbols
Formatting SI Units
+ +   = 

1.1
CLASS REFERENCE SUPPORT CONCEPTS SUPPLEMENTAL
15
Oct 16
Gimme a Break!

Explore the
Full-Screen Version of...
Falstad
Review:
Formatting SI Units
The INSERT Tab Pt. 1:
Header&Footer, Date&Time, Tables,
Page Break , Section Break
The REFERENCES Tab
Table of Contents

1.1
DER Parts Table
14
Oct 14
DER Guidelines
n

+ +   = 
Show/Hide, Ruler, Tabs, Breaks, Styles

Engineering: First Assignment
1.1
DER Exemplar

The Capacitor Visualizer
N. Vassos' (ACES '19)
The Capacitor Visualizer
Soldering Video Tutorial

Case Preparation and Assembly

Custom 3D-printed case, heat-set inserts,
Panel mount DC barrel jack,
hookup wires, heat shrink tubing,
3mm nylon mounting screws


Oct 11 THANKSGIVING WEEKEND (Oct 11-14)
CLASS REFERENCE SUPPORT CONCEPTS SUPPLEMENTAL
13
Oct 9
Worth watching...
How Capacitors Work

Explore this FALSTAD Simulation:
Capacitor Visualization

DMM: Capacitance
Review Capacitor Circuits on page 32
Prototype the circuit to the left...
...and then the rollover modification
Capacitors as Timers
: `tau = R times C`
12
Oct 7

pp. 31-34
Capacitors

The
Charge/Discharge
Circuit
Introducing TIMING (Delays) into our Circuits
Capacitor Codes
  


Falstad:
Capacitor Visualization

ACES' Frame Player: Capacitors
Capacitance:
UNITS:
(Micro)Farads (μF)
RANGES:

Tantalum vs Ceramic
CURRICULUM NIGHT (October 6)
CLASS REFERENCE SUPPORT CONCEPTS SUPPLEMENTAL
11
Oct 3
Digital-ish
Voltage H-Bridge
Digital-ish
Voltage H-Bridge
The DUAL Uses for the Potentiometer:
Variable Resistor and Voltage Divider

First Look at the...
Voltage H-Bridge
Analog-ish
Voltage H-Bridge
10
Oct 1


Pull DOWN
Resistor
Configurations

Pull UP
Resistor
Configurations
Button Logic and Voltage Division

Switches (SPST, SPDT, DPDT)

ACES' Frame Player: Switches
Rocket Launch
p. 25


Complete the
Rocket Launch Challenge!

JD HG CH RH JL
TMS WM LN WR AW
NC QD ED TJ, DL
TL MM em MO AT
9
Sep 29
PBNO


PBNC


'Mechanical' Input Devices
Buttons (PBNO, PBNC)
ACES' Frame Player:
Buttons
Digital Button Logic:
Pull-Down
and Pull-Up Resistor Configurations
ANALOG 1: SIGNALS, SUPPLY, SYMBOLS, SCHEMATICS
CLASS REFERENCE SUPPORT CONCEPTS SUPPLEMENTAL
8
Sep 25
Click image for details...
Click image for details...
ACES' Frame Player:
Variable Resistors

2. LDR: Light-Dependent Resistor
aka Photocell, Photoresistor, Optoresistor
3. Thermistor:Temp-Dependent Resistor
4. FSR: Force-Sensitive Resistor
5. Flex Sensor: Flex-Sensitive Resistor
J. Vretenar's: The Bionic Hand
Voltage: `V=IR`
Power: `P=IV`
7
Sep 23

e The 1N400n Diode
(for Circuit Protection)


Interactive Circuits :)
Fixed vs Variable Resistors
1. The Potentiometer (p. 11)
ACES' Frame Player: Potentiometer

TERRY FOX DAY (September 19)
CLASS REFERENCE SUPPORT CONCEPTS SUPPLEMENTAL
6
Sep 18
ACES' Frame Player: LED Circuits
RSGC ACES' LED Tester
Soldering, Assembly & Testing Session
Using Ohm's Law to determine the
Current (I) in a circuit :
`I=V/R`
Using Ohm's Law
and Kirchhoff's Laws
to
Analyze Circuits


5
Sep 16
o
LED Datasheet
First look at Circuit Diagrams
(aka Schematic
s)
Circuit Symbols
(p. 7)

Kirchhoff's Voltage Law (KVL)
DMM Confirmation of KVL
(Waterfall Model of Voltage Drop)
Current Calculation

Falstad
LED Circuit Comparison
CLASS REFERENCE SUPPORT CONCEPTS SUPPLEMENTAL



 
CP-202AH-ND 3M156313-06-ND
Your First Soldering Task
How To Solder: Curious Inventor
Soldering Tips from a former ACE
(Your Solder Tube)
4
Sep 12
Resistor Worksheet

Our first circuits...
ACES' Frame Player:
Fixed Resistors
Resistors in Series
First look at Circuit Diagrams
(aka Schematic
s)
Circuit Symbols
DC Circuits Workbook
p. 8

Falstad
Circuit Simulator Applet
Ohm's Law
(in terms of Voltage)
Voltage: `V=IR`

Power: `P=IV`
3
Sep 10
Neoteck DM4000 Pro
Auto-Ranging
Digital Multimeter (DMM)
 
The Breadboard
(Your Prototyping Workbench)
 
Second DMM Function:
2. Continuity (Conductance) ()
Where the MAGIC happens

2
Sep 8

 
 
First DMM Function:
1. Resistance (Ω)
Fixed (Current-Limiting) Resistor Applet


Familiarize yourself...
Powers and Prefixes (p. 6)
Greek and Phonetic Alphabets (p. 78)

BBC: Curiosity
The Driver of Success?


Giants of Electricity p.93
Discussion:
What is Electricity
?
The Atom
Water Analogies
Flow Models (Direction):
Electron (Neg →Pos)
(Science)
vs
Conventional (Pos→Neg)
(Electronics)
DC Circuits' Cover Video...
G. Davidge's: A Counting Circuit
Foundations: Grade 9 Science...
Voltage
Ohm's Law (in terms of Voltage):
`V=IxxR`

Current
Ohm's Law (in terms of Current):
`I=V/R`

Your Future: EVs and Batteries


Alkaline Battery Chemistry
CLASS REFERENCE SUPPORT CONCEPTS SUPPLEMENTAL
1
Sep 4

RSGC ACES: History

Student Outline
Mr. D's Schedule
[ACES Culture]

(PBS) Telsa:
Master of Lightning
Distribution of...
e

Humber College:
The Barrett
STEAM
Academy
REPUTATION and RESPECT
RSGC ACES Mission: Taking a
Short, Medium, and Long Term View
of your Futures

ACES Hall of Fame:
Schulich Leader: Xander Chin '22
J. Dolgin '20 (Tesla),
D. Raymond '19 (SpaceX),
E. Peterson '18 (Apple),
T. Morland '18 (Tesla),
E. McAuliffe '18,
P. Bagga '17 (Ford),
Mariano Elia '15:
Hackster.io, Argon Prototypes
ACES' Discord
Mr. D.'s (ACES) Focus:
Foundations

For our second Field Trip of the year we have been invited to visit a factory that is developing solar panels. Since this device is an integral part of our Greenhouse Project this year, early familiarity with this technology will be advantageous.
What better way is there to start the year than with a walking field trip to acquire the electronic components that we will make good use of? You'll also be aware of its location for your own personal projects.
I have no formal training in electronics or electrical engineering - I'm just really interested in this field. The knowledge and skill I have has been largely acquired over the last few years from learning alongside many talented Georgians and I look forward to expanding my capabilities by working with you this year.
I ask six things of my ACES (for most other things I'm usually flexible):
1. SHORTCUTS. The world has enough corner-cutters. This includes stealing, lying, cheating, or plagiarizing.
2. SHARED SPACE. Show respect for others that use the lab by putting your projects away and leaving your bench area tidy when you leave.
3. DES VISITORS. Show respect for adult visitors that enter the lab by immediately stopping what you are doing, standing and facing the individual(s).
4. NO EATING. Show respect for the lab by not eating in the DES. You may go into the hallway for a quick bite if you need to.
5. AVOID WASTE. Show respect for the lab's resources by not wasting or misusing them.
6. REPUTATION. Show respect for yourself by looking (and speaking) your best. It's the little things keep the doors of opportunity open.
  1. Matches will last exactly 5 minutes
  2. Two qualifying rounds (average points) will determine the initial Tournament seeding
  3. The top 8 seeds move on into the quarter-finals
  4. The Term 1 winner will play the winner of Term 2 in May to determine the Grade winner
  5. The Grade 10 winner will play one match against Mike Ciomyk to determine the 2015 School Champion
  6. Technical problems of any sort with your laptop during a match results in immediate disqualification from the match
Growing Success, p. 29
Responsibility, Organization, Independent Work, Collaboration, Initiative, Self-Reliant Growing Success. p.11.

It is worth noting, right from the start, that assessment is a human process, conducted by and with human beings, and subject inevitably to the frailties of human judgement.
However crisp and objective we might try to make it, and however neatly quantifiable may be our "results", assessment is closer to art than science.
It is, after all, an exercise in human communication.
Knowledge: Subject-specific content acquired in each course (knowledge), and the comprehension of its meaning and significance (understanding).
Thinking: The use of critical and creative thinking skills and/or processes, as follows:
Communication: The conveying of meaning through various forms, as follows:
Application: The use of knowledge and skills to make connections within and between various contexts.