| |
|
||||
|
|
|
||||
| MCU Predefines: io328p.h, iotnx4.h, iotn85.h, ATtiny Series-1: iotn414.h | |||||
|---|---|---|---|---|---|
| ACES EAGLE SMT RESOURCES: ACES_SMT.lbr (2020 01 10), ACES_SMT.dru, ACES_SMT.cam, JLCPCB.dru | |||||
| ACES Alumni Blogs/Companies: Ethan M '18, Ethan P '18, Dan R '19, Mariano E. '15 | |||||
| 2026-2027 TEJ4M: OPTIMIZATION | |||||
| +/- 9V Wien-Bridge Oscillator | |||||
| EASTER LONG WEEKEND (April 3-6) | |||||
| FAMILY DAY WEEKEND (February 13-16) | |||||
| CHRISTMAS BREAK (December 18 - January 5) | |||||
|
MOVEMBER: CHUMP III: ALU, ISP.Long |
|||||
| CLASS | REFERENCE | SUPPORT | CONCEPTS | SUPPLEMENTAL | |
| 24 Nov 23 |
![]() |
Work Period for
CHUMP: Arithmetic and Logic Unit (ALU) Falstad Simulation of 74LS181 ALU |
CHUMP Gem: ALU Explorer The extra distance - incorporating design ![]() |
3.2.3 | |
| CLASS | REFERENCE | SUPPORT | CONCEPTS | SUPPLEMENTAL | |
| 23 Nov 19 |
![]() |
Work Period for
CHUMP: Arithmetic and Logic Unit (ALU) |
CHUMP Gem: ALU Explorer ![]() |
3.2.3 | |
| 22 Nov 17 |
J. Shibley (ACES '21, Carleton '26) ![]() L. Roberston-Caryll (ACES '21, UBC '27) ![]() |
Watch the insanely-inspiring... ...ACES '21... ← ALU Lockdown Legacies ACES' ALU Breadboard Explorer ![]() You've got the time and resources ... ![]() ... to imagine a more permanent ALU Explorer Tasteful... ![]() |
K. Shirriff's ALU Blog... Inside the vintage 74LS181 ALU chip: How it works and why it's so strange ALU Logic Functions Worksheet Consider labelling your CHUMP chips Coming soon in uni PLCs vs FGPAs S. Appleyard (ACES '23, Dyson '27) Hear Planes Overhead ![]() |
3.2.3
Open Drain/Collector ![]() Looking for an ISP.Medium Idea ?? ACES SMD Solder Lapel Pin ![]() |
|
| MID-TERM BREAK (NOVEMBER 13-16) Classes Resume on Tuesday November 17 (Cycle 1 - Day 7) | |||||
| PARENT-TEACHER INTERVIEWS (November 11 and 12) | |||||
| CLASS | REFERENCE | SUPPORT | CONCEPTS | SUPPLEMENTAL | |
| 19 Nov 5 |
![]() |
Work Period for |
CHUMP Gem: Program EEPROM ![]() |
3.2.2 | |
| 21 Nov 11 ![]() |
![]() |
Pyjama Day |
ISP Gem: Desktop Study ACESistant ![]() |
AA JJ EK ZL NS |
|
| 20 Nov 9 |
Work Period for |
ISP Gem: 7-Segment Flip Dot ![]() |
Program EEPROM AA TB* NC ND MG JJ* EK ZL* ZM** GM LN NS** |
||
|
LATE OCTOBER: ISP.Long and CHUMP II: EEPROM - Burner and Program |
|||||
| CLASS | REFERENCE | SUPPORT | CONCEPTS | SUPPLEMENTAL | |
| 19 Nov 5 |
![]() |
Work Period for |
CHUMP Gem: Program EEPROM ![]() |
3.2.2 | |
| 18 Nov 3 |
![]() |
Work Period for |
CHUMP Gem: Program EEPROM ![]() |
3.2.2 | |
| CLASS | REFERENCE | SUPPORT | CONCEPTS | SUPPLEMENTAL | |
| 17 Oct 30 |
![]() |
Why do Engineers Confuse Hallowe'en with Christmas? (Managing your Mental Health) |
CHUMP Gem: Program EEPROM ![]() Note: A single AT28C16! |
3.3.1 (tomorrow) 3.2.2 |
|
| 16 Oct 28 |
Medium ISP Inspiration? Perceptrons |
A brief discussion of EEPROM Pagination Work Period for CHUMP: Program EEPROM |
CHUMP Gem: Program EEPROM ![]() |
3.3.1 3.2.2 AA JJ EK ZL NS |
|
| 15 Oct 26 |
ACES Alumni visit Monday October 26 (3-4) W. Xie (ACES '26, UofT '30) October 24, 2026 Marked the Final Pythagorean Triple Date of the Century |
Work Period for
CHUMP: Program EEPROM ![]() Nano R3 vs Nano ESP32 ![]() |
![]() Consider... Excalidraw ![]() |
3.3.1 3.2.2 ISP Gem 8-Bit Audio Player ![]() |
|
| CLASS | REFERENCE | SUPPORT | CONCEPTS | SUPPLEMENTAL | |
| 14 Oct 22 |
ISP Gem STM32 Development Board ![]() |
Work Period for ISP.Long or CHUMP: Program EEPROM D. Raymond and J. Corley CHUMP Board ('19) |
FNIRSI 2C53T Oscilloscope/DMM Introductions |
3.3.1
![]() |
|
| 13 Oct 20 |
Dual-digit 7-Segment Display
'24 Example L. Quintas-Tang |
CHUMP: Program EEPROM for coming classes. B. Eater's: Combinational Logic AND Enrichment. B. Eater's... |
ACES Alumni visit Monday October 26 (3-4) W. Xie (ACES '26, UofT '30) Open House 9-11 P1: ?? P2: Elias, Nigel AT28C16 Pinout ![]() |
3.3.1
ISP Gem Tiplady Turntable |
|
|
EARLY OCTOBER: CHUMP I - Introduction and Design: Code, Clock, Counter |
|||||
| CLASS | REFERENCE | SUPPORT | CONCEPTS | SUPPLEMENTAL | |
| 12 Oct 16 |
3.0 SMD Practice ![]() |
CHUMP: Code, Clock and Counter Work Period Design Files Repository Open House Volunteers? 9-11 On Tuesday October 20 |
JJ*, LN* AA, JJ, EK, NS Code, Clock and Counter AA*, TB*, NC, ND MG, JJ, EK, ZL ZM, GM, LN, NS |
||
| 11 Oct 14 |
![]() |
M. Graves Program Counter Introduction SN74LS161 CHUMP: Code, Clock and Counter Work Period |
ACES Alumni visit (3-4) R. Jamal (ACES '25, McGill '29) ) ![]() |
12-LED Bargraph![]() |
|
| THANKSGIVING LONG WEEKEND (October 9-12) | |||||
| CLASS | REFERENCE | SUPPORT | CONCEPTS | SUPPLEMENTAL | |
| 10 Oct 7 |
555 Tutorial
![]() |
![]() |
CHUMP: Clock video series: Part 1: Astable video series: Part 2. Monostable video series: Part 3. Bistable video series: Part 4: Clock Logic |
3.2.1 Drawing Standards Fusion: Differences between ASME and ISO Drawing Standards |
|
| CURRICULUM NIGHT (October 5 - Day 7) | |||||
| 9 Oct 5 |
CHUMP: CHUMPanese Examples (p. 18) ![]() |
CHUMP IC Assignments CHUMP VM (CodePen) Swapping Variables Try it! CHUMPanese: 3, 2, 1, 0, 3, 2, 1, 0, 3, 2, 1, 0, 3, 2,... |
For your CHUMP DER... CHUMP Inspiration... L. McCartney (ACES '24) Custom Bargraph Display ![]() Design Files Repository |
3.1
4-Way Traffic Light AA, TB*, NC*, ND MG, EK, ZL* ZM**, GM*, NS* ![]() ![]() |
|
| CLASS | REFERENCE | SUPPORT | CONCEPTS | SUPPLEMENTAL | |
| 8 Oct 1 |
3.0 SMD Practice ![]() |
CHUMP: A Simple and Affordable TTL Processor D. Feinberg 4. Instruction Set 5. Control Logic 6. Course Content 7. The CHUMPanese Language 8. Reflection |
CHUMP Inspiration... X. Chin (ACES '22) Address Register ALU ![]() |
3.1 |
|
| 7 Sep 29 |
CHUMP: Workbook ![]() |
CHUMP: A Simple and Affordable TTL Processor D. Feinberg 1. Introduction 2. Lab Kit Requirements 3. Datapath Von Neumann vs Harvard |
CHUMP Inspiration... D. Raymond & J. Corley (ACES '19) CHUMP on PCB ![]() |
3.1
ACES' Own @ SpaceX ![]() |
|
| TERRY FOX DAY (September 25) | |||||
| CLASS | REFERENCE | SUPPORT | CONCEPTS | SUPPLEMENTAL | |
| 6 Sep 24 |
3.0 SMD Practice ![]() |
Alumni Visit ![]() |
3.1 Either 4-Way Traffic Light or CharlieClock | ||
| 5 Sep 22 |
3.0 SMD Practice ![]() |
![]() |
3.1 Either 4-Way Traffic Light or CharlieClock | ||
| CLASS | REFERENCE | SUPPORT | CONCEPTS | SUPPLEMENTAL | |
| 4 Sep 18 |
3.0 SMD Practice ![]() |
![]() |
'Doing More with Less' Philosophy... Introduction to Charlieplexing CharlieStick Task (completed) Programming an ATtiny85 for your 4-Way Traffic Light with the RSGC ACES ATtiny85 ISP Breakout Board ![]() |
3.1 Either 4-Way Traffic Light or CharlieClock | |
![]() |
|||||
| 3 Sep 16 |
3.0 SMD Practice ![]() |
Math is Fun: Permutations |
'Doing More with Less' Philosophy... Introduction to Charlieplexing CharlieStick Task Please have this prototype ready to go for the START of P1 ![]() |
3.1 Either 4-Way Traffic Light or CharlieClock | |
| SMD Soldering Project |
Watch ![]() |
The instructions |
3.0 | ||
| 2 Sep 14 |
3.0 SMD Practice ![]() |
'Doing More with Less' Philosophy... Introduction to Charlieplexing ACES' 12-LED SMT CharlieStick ![]() ![]() The key to Charlieplexing? Tri-Stated Digital IO Pins! (Logic 1, Logic 0 and Hi-Impedance (disconnected)) |
3.1 Either 4-Way Traffic Light or CharlieClock | ||
|
Theory is when you know everything but nothing works. |
|||||
| CLASS | REFERENCE | SUPPORT | CONCEPTS | SUPPLEMENTAL | |
| 1 Sep 10 |
2026/2027 ACES' Program Our ACES' Program: Contradictions Student Outline Mr. D's Timetable ![]() |
ACES Hall of Fame: R. Jamal '25 J. Dolgin '20 (Tesla), E. Peterson '18 (Jane St. Capital), E. McAuliffe '18, P. Bagga (Ford), Mariano Elia '15: Hackster.io, Argon Prototypes Day Calendar |
Jumper Wire Supplements (0.3" and 0.4") Distribution of TA Comments |
3.0 SMD Practice
3.1 Either CharlieClock or 4-Way Traffic Light | |
|
|||||